网站首页期刊简介编委会过刊目录投稿指南广告合作征订与发行联系我们English
多关节机器人驱动式锻压步进梁
英文标题:Forging walking beam driven by multi joint robots
作者:刘庆生 曾琦  姚宏亮 刘波 赵一冰 
单位:北京机电研究所 
关键词:步进梁 锻压 机器人 驱动梁 运动轨迹 
分类号:TG315
出版年,卷(期):页码:2017,42(9):102-106
摘要:

介绍了锻压用步进梁发展所经历的3个阶段,通过分析每个阶段步进梁的动力来源、结构特点和局限性,提出了第4代步进梁,并分析了其优越性。第4代步进梁利用多关节机器人的三维空间自由轨迹和高定位精度的特点,通过机器人的运动来实现锻压工件精准步进。此外,对传统步进梁和多关节机器人步进梁的运动轨迹进行了分析,并设计了机器人驱动式步进梁的驱动梁的机械结构,同时利用数值模拟技术对驱动梁进行了结构分析。最后,通过试用样机验证了多关节机器人驱动式锻压步进梁良好的同步性、灵活性和适应性。

It was introduced the three development stages of the forging walking beam. By analyzing power source, structure characteristics and limitations of walking beam in every stage, the fourth generation walking beam was put forward, and its advantages were analyzed. Then, based on its characteristics of three-dimensional free trajectory and high positioning accuracy of multi-joint robots, the precise movement of forging parts were realized by robot moving. In addition, the trajectories of the traditional walking beams and multi-joint robots driven walking beam were analyzed, and the driving beam mechanical structure of the robot driven walking beam was designed. At the same time, the structure of the driving beam was analyzed by numerical simulation. Finally, a prototype verified the good synchronization, flexibility and adaptability of the walking beam driven by multi-joint robots.
 

基金项目:
作者简介:
刘庆生(1979),男,硕士,高级工程师 E-mail:kuailelqs@163.com
参考文献:


[1]中国机械工程学会塑性工程学会.锻压手册:第一卷[M].北京:机械工业出版社,2007.


Plastic Engineering Society of China Mechanical Engineering Society. Handbook of Forging:Vol.1[M]. Beijing: China Machine Press,2007.



[2]石小荣.多工位齿轮热模锻自动化锻造线[J].金属加工,2013,(19):11-12.


Shi X R. Automatic forging line for multi station gear hot forging[J].Metal Working, 2013,(19):11-12.



[3]杨成忠,王洪兴.如何实现2.0 L曲轴在4000 t步进梁自动线上量产[J].锻造与冲压,2017,(5):26-28.


Yang C Z, Wang H X. How to realize the 2.0 L crankshaft production on the 4000 t step beam automatic line[J]. Forging & Metalforming, 2017,(5):26-28.



[4]蒋鹏,孙勇.锻造自动化技术应用进展及改造建议[J].金属加工,2014,(21):5-7.


Jiang P, Sun Y. Application progress and modification suggestion of automation forging technology[J]. Metal Working, 2014,(21):5-7.



[5]朱德嵩,张进,秦安刚.步进梁式锻造自动化生产线工艺问题与对策[J].锻造与冲压,2011,(10):49-50.


Zhu D S, Zhang J, Qin A G. Process problems and countermeasures of automatic production line of walking beam forging[J]. Forging & Metalforming, 2011,(10):49-50.

服务与反馈:
本网站尚未开通全文下载服务】【加入收藏
《锻压技术》编辑部版权所有

中国机械工业联合会主管  中国机械总院集团北京机电研究所有限公司 中国机械工程学会主办
联系地址:北京市海淀区学清路18号 邮编:100083
电话:+86-010-82415085 传真:+86-010-62920652
E-mail: fst@263.net(稿件) dyjsjournal@163.com(广告)
京ICP备07007000号-9