网站首页期刊简介编委会过刊目录投稿指南广告合作征订与发行联系我们English
偏载对大型双柱预应力机架的影响
英文标题:Influence of eccentric load on large double-column prestressed frame
作者:刘东林 刘艳妍 
单位:兰州交通大学 
关键词:双柱液压机 预应力机架 偏载工况 纵向偏载 预应力 预紧系数 
分类号:TG315
出版年,卷(期):页码:2022,47(5):175-180
摘要:

针对双柱上推式锻造液压机,分析了在锻造过程中存在的偏载工况,研究了偏载的传递路径,明确了纵向偏载总是存在的客观性。建立了双柱预应力机架的力学模型,分析了在偏载作用下机架的受力状态。结合对机架工作过程的研究,确定了预应力的计算方法。实例计算结果表明:锻造偏心距从100 mm增至250 mm,机架的预紧系数分别从横向偏载工况下的1.12增至1.45、从纵向偏载工况下的1.14增至1.77,机架在纵向偏载工况下为了保证自身整体性所需的预应力更大。通过仿真分析进一步比较立柱与下梁间接合面的闭合状态,结果表明:相较于横向偏载工况,机架在纵向偏载工况下更易开缝且最大缝隙更大;对于纵向偏载工况,立柱的纵向挠度随着预紧系数的增加显著减小,且预紧系数增至1.8时,最大缝隙趋于0 mm,验证了计算方法的可行性。并基于偏载工况与预应力机架的研究,提出了在机架预应力的计算过程中有必要考虑纵向偏载产生的影响。

For the double-column push-up forging hydraulic press, the eccentric load condition in the forging process was analyzed, the transfer path of eccentric load was studied, and the objectivity that the vertical eccentric load always exists was clarified. Then, the mechanical model of double-column prestressed frame was established, and the stress state of frame under the eccentric load was analyzed. Combined with the research on the working process of the frame, the calculation method of prestress was determined. The example calculation results show that the forging eccentricity increases from 100 mm to 250 mm, the pretension coefficient of the frame increases from 1.12 to 1.45 under the horizontal eccentric load condition and from 1.14 to 1.77 under the vertical eccentric load condition, and the prestress of the frame is greater to ensure its integrity under the vertical eccentric load condition. Through the simulation analysis, the closed state of indirect joint surface between column and lower beam was further compared. The results show that compared with the horizontal eccentric load condition, the frame is easier to crack under the vertical eccentric load condition, and the maximum gap is larger. For the vertical eccentric load condition, the vertical deflection of column decreases significantly with the increasing of the pretension coefficient, and when the pretension coefficient increases to 1.8, the maximum gap tends to 0 mm, and the feasibility of the calculation method is verified. Based on the study of eccentric load condition and prestressed frame, it is suggested that it is necessary to consider the influence of vertical eccentric load in the calculation process for the frame prestress. 

基金项目:
国家自然科学基金资助项目(51265022);甘肃省科技计划资助项目(145RJZA187)
作者简介:
作者简介:刘东林(1993-),男,硕士研究生,E-mail:18246638209@163.com;通信作者:刘艳妍(1964-),女,学士,教授,E-mail:liuyy@mail.lzjtu.cn
参考文献:

[1]高峰,郭为忠,宋清玉,. 重型制造装备国内外研究与发展[J]. 机械工程学报,2010,46(19):92-107.


Gao F,Guo W Z,Song Q Y,et al. Current development of heavy-duty manufacturing equipments[J]. Journal of Mechanical Engineering,2010,46(19):92-107.


[2]陈飞,朱华佳,李佳航,. 金属材料热锻过程组织演化建模方法的新进展[J]. 锻压技术,2021,46(9):16-21.


Chen F,Zhu H J,Li J H,et al. New progress on modeling methods of microstructure evolution in hot forging process of metallic materials[J]. Forging & Stamping Technology,2021,46(9):16-21.


[3]郭晓峰,成先飚,张建华. 自由锻造液压机的发展与展望[J]. 重型机械,2012,(3):29-32.


Guo X F,Cheng X B,Zhang J H. Development and outlook of free forging hydraulic press[J]. Heavy Machinery,2012,(3):29-32.


[4]蔡墉. 我国自由锻液压机和大型锻件生产的发展历程[J]. 大型铸锻件,2007,(1):37-44.


Cai Y. The developmental course of our free-forging hydraulic press and the heavy casting and forging production[J]. Heavy Casting and Forging,2007,(1):34-44.


[5]刘艳妍,杨晋,马学鹏,.上推式快锻液压机活动横梁转动自锁条件研究[J]. 机械工程学报,2014,50(8):66-72.


Liu Y Y,Yang J,Ma X P,et al. Rotating self-locked condition research of the pushing high-speed forging hydraulic press′movable beam[J]. Journal of Mechanical Engineering,2014,50(8):66-72.


[6]俞新陆. 液压机的设计与应用[M]. 北京:机械工业出版社,2007.


Yu X L. The Design and Application of Hydraulic Press[M]. Beijing:China Machine Press,2007.


[7]董晓传,金淼. 预紧组合结构液压机临界预紧力的研究[J]. 中国机械工程,2014,25(9):1158-1163.


Dong X C,Jin M. Study on critical preload of prestressed composite structure hydraulic press[J]. China Mechanical Engineering,2014,25(9):1158-1163.


[8]马辉,能海强,宋溶泽,. 两种工况下锻压组合机架的接触特性分析[J]. 东北大学学报:自然科学版,2013,34(9):1300-1304.


Ma H,Nai H Q,Song R Zet al. Contact characteristics analysis of combination frame of forging press under two conditions[J]. Journal of Northeastern UniversityNatural Science,2013,34(9):1300-1304.


[9]刘豪,宋朝省,朱才朝,. 100 MN锻压机偏载承载能力分析[J]. 重型机械,2018,(3):46-51.


Liu H,Song C S,Zhu C C,et al. Analysis of load capacity for 100 MN forging machine[J]. Heavy Machinery,2018,(3):46-51.


[10]高梦迪,刘志峰,黄海鸿,. 液压机滑块导向装置最佳配合设计方法研究[J]. 中国机械工程,2016,27(24):3267-3272. 


Gao M D,Liu Z F,Huang H H,et al. A novel method for best fit design of slide guide device in hydraulic press[J]. China Mechanical Engineering,2016,27(24):3267-3272.


[11]JB/T 12229—2015,油泵直接传动双柱斜置式自由锻造液压机[S].


JB/T 12229—2015,Double-column oblique type open-die forging hydraulic press with direct drive of oil pump[S].


[12]濮良贵,纪名刚. 机械设计[M]. 8. 北京:高等教育出版社,2006.


Pu L G,Ji M G. Design of Machinery[M]. 8th Edition.Beijing:Higher Education Press,2006.

服务与反馈:
文章下载】【加入收藏
《锻压技术》编辑部版权所有

中国机械工业联合会主管  中国机械总院集团北京机电研究所有限公司 中国机械工程学会主办
联系地址:北京市海淀区学清路18号 邮编:100083
电话:+86-010-82415085 传真:+86-010-62920652
E-mail: fst@263.net(稿件) dyjsjournal@163.com(广告)
京ICP备07007000号-9