[1]康日新. 关于我国核电可持续发展的思考[J]. 管理现代化, 2003,(1):5-9.Kang Rixin. Thoughts on the sustainable development of China's nuclear power[J]. Management Modernization, 2003,(1):5-9. [2]Komei Suzuki, Ikuo Sato, Mikio Kusuhashi, et al. Current steel forgings and their properties for steam generator of nuclear power plant[J]. Nuclear Engineering and Design, 2000,(198): 15-23. [3]任运来, 聂绍珉. 大型封头整体锻造新方法研究[J]. 重型机械, 2000,(5): 20-22.Ren Yunlai, Nie Shaomin. New method study on large container head integrated forging[J]. Heavy Machinery, 2000,(5): 20-22. [4]王兵, 王宇维, 李富江. 大型封头模具的设计方法与研究[J]. 一重技术, 2003,(4): 12-13.Wang Bing, Wang Yuwei, Li Fujiang. Design methods and research for large container head dies[J]. CFHI Technology, 2003,(4): 12-13. [5]姜涛, 杨运民, 程巩固. 基于DEFORM的大型封头整体锻造工艺数值模拟[J]. 压力容器, 2009,26(2): 26-29.Jiang Tao, Yang Yunmin, Cheng Gonggu. Numerical simulation on the forging process of integrated pressure vessel based on Deform-3D[J]. Pressure Vessel Technology. 2009, 26(2): 26-29. [6]郭玉茹. 大型厚壁半球形封头成形工艺的理论与实验研究[D].太原:太原科技大学,2009.Guo Yuru. Theoretical and Experimental Studies of Large Thick Hemispherical Head Forming Process[D]. Taiyuan:Taiyuan University of Science and Technology,2009.
|