[1]邢娜,何立波,黄维.我国重轨生产工艺及品种发展现状[J].冶金管理,2011,(4):16-19.Xing N,He L B,Huang W. The development status of heavy rail straightening process and variety in our country[J].Metallurgical Management,2011,(4):16-19 [2]崔甫.矫直原理与矫直机械[M].北京:冶金工业出版社,2002.Cui F. Straightening Theory and Straightening Machine[M].Beijing: Metallurgical Industry Press,2002. [3]Schleinzer G,Fischer F D. Residual stress formation during the roller straightening ofrailway rails[J]. International Journal of Mechanical Sciences,2001,(43):2281-2295. [4]Wineman S J, McClintock F A. Rail web fracture in thepressure of residual stress[J].Theor.Appl.Fract.Mech.,1992,2(8):87-99. [5]Uwe Zerbst, Manfred Schel,RenéHeyder.Damage tolerance investigation on rails[J].Engineering Fracture Mechanics,2009,76:2637-2653. [6]Srimani S L, Pankaj A C,Basu J. Analysis of end straightnessof rail during manufacturing[J]. International Journal of Mechanical Sciences,2005,47:1874-1884.
|