Abstract:
|
The heat treatment of forged small roll blank(1.5 t ESR ingot) takes a long period,which influences production efficiency.Optimized heat treatment process design was decided by researching and analyzing the group of tests on the process of normalization,spheroidization and hydrogen annealing.The double stages of spheroidization was changed into a single stage for that the normalization was canceled,which saved operating time of 45 h and the production efficiency was almost increased by 20% based on keeping the previous properties.
|
Funds:
|
|
AuthorIntro:
|
|
Reference:
|
[1]刘润广.锻造工艺学[D].黑龙江:哈尔滨工业大学,1992.
[2]石德珂.材料科学基础[M].北京:机械工业出版社,2002.
[3]康大韬,叶国斌.大型锻件材料及热处理[M].湖北:龙门书局,1998.
[4]李朝华.9Cr2Mo大型冷轧辊辊坯研制[J].大型铸锻件,2008,122(2):15-17.
|
Service:
|
【This site has not yet opened Download Service】【Add
Favorite】
|
|
|