Title:Research on productivity improvement of forging line
Authors: YAN Feng 
Unit: Shanghai Aichi Forging Co.  Ltd. 
KeyWords: forging production line  equipment failure  production efficiency  production process 
ClassificationCode:TG316
year,vol(issue):pagenumber:2013,38(6):20-24
Abstract:

Taking 50000kN hot die forging machine unit as a research object, starting with equipment efficiency analysis, the reasons affecting the efficiency were pointed out. Problem diagnosis and analysis methods were taken to find the primary cause of the equipment fault and waiting.  Then the corresponding strategies were presented. The problems, such as the high temperature of shaft in intermediate frequency furnace and the pipe connection were improved. As a result, the net production time was increased by 17%, as well as the  productivity was increased by 28%. The enterprise production volume could meet the market requirements and achieve energy saving effect simultaneouslly.

Funds:
AuthorIntro:
Reference:


[1]Driffield N,  Munday M. Foreign manufacturing, regional agglomeration and technical efficiency in UK industries: a stochastic production frontier approach[J]. Regional Studies, 2001,(35):391-399.
[2]Margono  H, Sharma S C. Efficiency and productivity analyses of indonesian manufacturing industries[J]. Journal of Asian Economics, 2006, (17):979-995.
[3]李春顶. 中国制造业行业生产率的变动及影响因素——基于DEA技术的1998~2007年  行业面板数据分析[J]. 数量经济技术经济研究,2009,(12):58-69.Li C D. Chinas manufacturing industrry and the impact of changes in productivity——1998-2007 based on DEA technology industry panel data analysis[J].The Journal of Quantitative & Technical Economics,2009,(12):58-69.
[4]Fare Rolf, Grosskopf Shawna, Pasurka Carl. Accounting for air pollution emissions in measuring state manufacturing productivity growth[J]. Journal of Regional Science, 2009, (41):381-409.
[5]庞如英. 基于人因工程的提高生产率模型的设计与应用[J].机械研究与应用, 2007,20(6):10-12.Pang R Y. Design and application of model to improve productivity based on human factors[J].Mechanical Research & Application,2007,20(6):10-12.
[6]原鹏飞,何枫. 中国制造业生产效率变迁研究 [J]. 软科学,2005,19(6):31-33.Yuang P F, He F. The study of production efficiency of manufacturing industry in China[J]. Soft Sience, 2005,19(6):31-33.
[7]吴献金,陈晓乐. 中国汽车产业全要素生产率及影响因素的实证分析[J]. 财经问题研究, 2011,(3):41-45Wu X J, Chen X L. Demonstration analysis on complete factor productivity and effect in China automobile industry [J].Research on Financial and Economic Issues,2011,(3):41-45.
[8]门田安弘.新丰田生产方式[M].保定:河北大学出版社,2001.Yasuhiro Monden. Toyota Production System[M]. Baoding: Hebei University Press,2001.
[9]王果. S公司精益生产之减少换模时间研究[D], 长沙:中南大学, 2010.    Wang G. Research on Lean Production for Shorting Die Changing Time in S Company[D]. Changsha: Central South University,2010.
[10]尤建新,雷星晖,陈守明,等.高级管理学[M].上海:同济大学出版社,2003.You J X, Lei X H, Chen S M,et al. Senior Management[M]. Shanghai: Tongji University Press, 2003.

Service:
This site has not yet opened Download Service】【Add Favorite
Copyright Forging & Stamping Technology.All rights reserved
 Sponsored by: Beijing Research Institute of Mechanical and Electrical Technology; Society for Technology of Plasticity, CMES
Tel: +86-010-62920652 +86-010-82415085     Fax:+86-010-62920652
Address: No.18 Xueqing Road, Beijing 100083, P. R. China
 E-mail: fst@263.net    dyjsgg@163.com