Title:Continuous rolling forming process of underground high-power electric heater
Authors: Zhang Wanpeng1 2 Zhang Jingang1 2 Song Hongbing1 2 Zhou Chao1 2 Xie Hang1 2 Tian Xiaojiang1 2   Wang Xiaogang3 Xing Yulin3 
Unit: (1.Chinese National Engineering Research Center for Petroleum and Natural Gas Tubular Goods Co.  Ltd.  Xi′an 710018 China   2.CNPC Baoji Petroleum Pipe Industry Co.  Ltd.  Baoji 721008  China   3.High-end Heavy Machinery Equipment Research Institute  Taiyuan University of Science and Technology Taiyuan 030024 China) 
KeyWords: magnesium oxide powder  continuous rolling  electric heater  continuous tube compound material 
ClassificationCode:TG335.6+3
year,vol(issue):pagenumber:2024,49(12):98-105
Abstract:

 Abstract: Underground high-power electric heater is the core equipment of electric heating technology, and there is no production unit with mature manufacturing technology in China. Therefore, combining existing theories of tube and bar rolling with the production process of rigid cables, a continuous rolling process for underground high-power electric heater was proposed, and the metal strip coiling, powder filling and continuous rolling were combined into a production line. Then, through experiments and finite element methods, the key influencing factors such as diameter reduction deformation of outer sheath,rolling density of magnesium oxide powder filling, equivalent yield strength and interface bonding strength were studied to prepare a good electric heater. Its maximum rolling density of magnesium oxide powder was about 2.80 g·cm-3, and the equivalent yield strength was about 120 MPa. Furthermore, the continuous tube and the electric heater are effectively combined, and the mechanical bonding force reached 3.4 MPa.

 
Funds:
基金项目:中国石油天然气集团有限公司前瞻性基础性技术攻关项目(2022DJ1409)
AuthorIntro:
作者简介:张万鹏(1976-),男,硕士,高级工程师 E-mail:bsgzwp@cnpc.com.cn
Reference:

 
[1]许宁,张俊杰,叶锋,等.非常规油藏蓄能体积压裂的合理压裂规模研究
[J].石油地质与工程,2024,38(2):97-101.


 

Xu N, Zhang J J, Ye F, et al. Research on the reasonable fracturing scale of energy storage volume fracturing in unconventional oil reservoirs
[J].Petroleum Geology and Engineering, 2024, 38 (2): 97-101.

 


[2]张万鹏,张锦刚,宋红兵,等.井下大功率电加热器制造工艺与应用
[J].焊管,2023,46(9):33-40,48.

 

Zhang W P, Zhang J G, Song H B, et al. Manufacturing process and application of underground high-power electric heaters
[J].Welded Pipe, 2023, 46 (9): 33-40,48.

 


[3]胡文瑞.中国石油非常规油气业务发展与展望
[J].天然气工业,2008(7):5-7,129-130.

 

Hu W R. Development and prospect of china petroleum′s unconventional oil and gas business
[J].Natural Gas Industry, 2008 (7): 5-7,129-130.

 


[4]邹才能,张国生,杨智,等.非常规油气概念、特征、潜力及技术——兼论非常规油气地质学
[J].石油勘探与开发,2013,40(4):385-399,454.

 

Zou C N, Zhang G S, Yang Z, et al. Concept, characteristics, potential, and technology of unconventional oil and gas: A discussion on unconventional oil and gas geology
[J].Petroleum Exploration and Development, 2013, 40 (4): 385-399,454.

 


[5]李国欣,朱如凯.中国石油非常规油气发展现状、挑战与关注问题
[J].中国石油勘探,2020,25(2):1-13.

 

Li G X, Zhu R K. The current situation, challenges, and concerns of unconventional oil and gas development in China petroleum
[J].China Petroleum Exploration, 2020, 25 (2): 1-13.

 


[6]李国欣,雷征东,董伟宏,等.中国石油非常规油气开发进展、挑战与展望
[J].中国石油勘探,2022,27(1):1-11.

 

Li G X, Lei Z D, Dong W H, et al. Progress, challenges, and prospects of china petroleum′s unconventional oil and gas development
[J].China Petroleum Exploration, 2022, 27 (1): 1-11.

 


[7]唐崇健.矿物绝缘电缆生产线的兴建与改造
[J].电线电缆,2003(6):15-18.

 

Tang C J. Construction and renovation of mineral insulated cable production line
[J].Wire and Cable, 2003 (6): 15-18.

 


[8]孙江河.国内外中低熟页岩油原位改质机理研究进展
[J].石化技术,2022,29(5):144-146.

 

Sun J H. Research progress on insitu upgrading mechanism of medium low maturity shale oil at home and abroad
[J].Petrochemical Technology, 2022, 29 (5): 144-146.

 


[9]薛华庆,杜发平,徐文林.油页岩电加热原位开采技术研究进展
[J].天然气技术,2010,4(1):18-20,77.

 

Xue H Q, Du F P, Xu W L. Research progress on insitu electric heating mining technology for oil shale
[J].Natural Gas Technology, 2010,4 (1): 18-20,77.

 


[10]赵文智,胡素云,侯连华.页岩油地下原位转化的内涵与战略地位
[J].石油勘探与开发,2018,45(4):537-545.

 

Zhao W Z, Hu S Y, Hou L H.The connotation and strategic position of insitu transformation of shale oil underground
[J].Petroleum Exploration and Development, 2018, 45 (4): 537-545.



[11]王盛鹏,刘德勋,王红岩,等.原位开采油页岩电加热技术现状及发展方向
[J].天然气工业,2011,31(2):114-118,134.

 

Wang S P, Liu D X, Wang H Y, et al. The current status and development direction of electric heating technology for insitu oil shale mining
[J].Natural Gas Industry, 2011, 31 (2): 114-118,134.

 


[12]崔景伟,朱如凯,侯连华,等.页岩原位改质技术现状、挑战和机遇
[J].非常规油气,2018,5(6):103-114.

 

Cui J W, Zhu R K, Hou L H, et al. The current status, challenges, and opportunities of in-situ shale modification technology
[J].Unconventional Oil and Gas, 2018,5 (6): 103-114.

 


[13]何万军,鲍海娟,马鸿,等.超稠油油藏小井距蒸汽吞吐转蒸汽驱先导试验
[J].特种油气藏,2014,21(4):130-133,157.

 

He W J, Bao H J, Ma H, et al. Pilot test of steam huff and puff conversion to steam flooding in small well spacing of ultra heavy oil reservoirs
[J].Special Oil and Gas Reservoirs, 2014, 21(4): 130-133,157.

 


[14]邱琪,赵样,王培培.电加热技术在油田集输工艺中的应用
[J].化工设计通讯,2020,46(6):62,71.

 

Qiu Q, Zhao Y, Wang P P. Application of electric heating technology in oilfield gathering and transportation technology
[J].Chemical Design Newsletter, 2020,46 (6): 62,71.

 


[15]张希杰,余斌,刘羽飞,等.轧制及退火工艺对C5100铜带材组织性能的影响
[J].铜业工程,2023(2):114-121.

 

Zhang X J,Yu B, Liu Y F,et al. Microstructure and properties of C5100 copper strip with different rolling and annealing processes
[J].Copper Engineering,2023(2):114-121.

 


[16]杨银,李仁庚.两步低温轧制与时效工艺对Cu-Cr-Zr-Hf合金组织和性能的影响
[J].铜业工程,2023(6):13-20.

 

Yang Y, Li R G. Structure and properties of Cu-Cr-Zr-Hf alloy by two-step cryogenic rolling and aging process
[J]. Copper Engineering, 2023(6): 13-20.

 


[17]石其帅,王效岗,耿雪文,等.矿物绝缘电缆轧制成形计算模型
[J].塑性工程学报,2022,29(10):178-187.

 

Shi Q S, Wang X G, Geng X W, et al. Calculation model for rolling forming of mineral insulated cable
[J].Journal of Plasticity Engineering, 2022, 29 (10): 178-187.

 


[18]双远华.无缝钢管轧制工艺及其数值模拟
[M].北京:国防工业出版社,2012.

 

Shuang Y H. Seamless Steel Pipe Rolling Process and Its Numerical Simulation
[M].Beijing: National Defense Industry Press, 2012.

 


[19]CJ/T 192—2017,内衬不锈钢复合钢管
[S].

 

CJ/T 192—2017, Lined stainless steel composite steel pipe
[S].

 


[20]SY/T 6623—2018, 内覆或衬里耐腐蚀合金复合钢管规范
[S].

 

SY/T 6623—2018, Specification for corrosion-resistant alloy composite steel pipes with inner cladding or lining
[S].

 


[21]叶力平. 双金属管连轧变形过程数值模拟与试验研究
[D].太原:太原科技大学,2014.

 

Ye L P. Numerical Simulation and Experimental Study on Deformation Process of Bimetallic Tube Continuous Rolling
[D].Taiyuan: Taiyuan University of Science and Technology, 2014.


 

 
Service:
This site has not yet opened Download Service】【Add Favorite
Copyright Forging & Stamping Technology.All rights reserved
 Sponsored by: Beijing Research Institute of Mechanical and Electrical Technology; Society for Technology of Plasticity, CMES
Tel: +86-010-62920652 +86-010-82415085     Fax:+86-010-62920652
Address: No.18 Xueqing Road, Beijing 100083, P. R. China
 E-mail: fst@263.net    dyjsgg@163.com