Title:Remanufacturing technology and application of heavy-duty wire-wound extrusion cylinder
Authors: Qin Ruiting1  Meng Keke2 Liu Zhengwei1 Liu Yaxin1 Gao Ru1  Lei Bingwang1 
Unit: 1. Inner Mongolia North Heavy Industries Group Corp.Ltd.  2. College of Mechanical Engineering  Inner Mongolia University of Science & Technology 
KeyWords: wire winding  extrusion cylinder  press-fitting  remanufacturing  heavy-duty extrusion cylinder 
ClassificationCode:TG375+.4
year,vol(issue):pagenumber:2025,50(3):189-196
Abstract:

 As a key die tooling in the hot extrusion process of large-diameter difficult-to-deform alloy pipesthe heavy-duty wire-wound extrusion cylinder has a multi-layer combined structure ,where the innermost liner is the working component and the outer cylinder is reinforced with pre-stressed steel wires. Crack failure occurred in the inner liner of the extrusion cylinder after long-term use. For the problems of high cost and extended downtime associated with the conventional disassembly-based repair methods, an innovative press-fit remanufacturing methodology, which involved pressing a new inner liner into the failed extrusion cylinder, was developed. Finite element simulation was employed to validate the feasibility of efficient liner replacement in pre-stressed wire-wound extrusion cylinder. Press-fitting was conducted using a 36,000-ton vertical extrusion press, where a pressing force of 4,030 ton was measured under an interference amount of 0.63 mm between the new inner liner and the middle liner of extrusion cylinder. The remanufactured extrusion cylinder remained fully operational after extruding 2,000 seamless steel pipes, which confirmed the feasibility of remanufacturing technology for the extrusion cylinder.

Funds:
国防基础科研计划(JCKY2022208A002)
AuthorIntro:
作者简介:秦瑞廷(1986-),男,硕士,高级工程师 E-mail:842810041@qq.com 通信作者:孟可可(1986-),男,硕士,副教授 E-mail:mengkk@imust.edu.cn
Reference:

 [1]3.6万吨黑色金属垂直挤压机成套装备[J].国防科技工业,2015(7):48.


 


36,000-ton ferrous metal vertical extrusion press complete equipment[J]. National Defence Science & Technology Industry, 2015 (7):48.


 


[2]刘长勇.重型钢丝缠绕黑色金属挤压筒及挤压工艺研究[D]. 北京:清华大学,2011.


 


Liu C Y. Research on Heavyduty Wirewound Ferrous Metal Extrusion Container and Extrusion Process [D]. Beijing: Tsinghua University, 2011.


 


[3]刘长勇,张磊,林峰,.钢丝缠绕黑色金属挤压筒的设计[J].机械工程学报,2013,49(8):78-83.


 


Liu C Y, Zhang L, Lin F, et al. Design of steel wire wound extrusion containers for steel hot extrusion process [J]. Journal of Mechanical Engineering, 2013, 49(8):78-83.


 


[4]陈明. H13钢挤压筒、模具磨损失效行为分析[J].甘肃科技纵横,2023,52(2):31-34.


 


Chen M. Analysis of wear failure behavior of H13 steel extrusion container and die [J]. Gansu Science and Technology Information, 2023, 52(2): 31-34.


 


[5]王霞,荆志龙.挤压筒内衬纵向开裂原因分析[J].物理测试,2023,41(1):25-30.


 


Wang X, Jing Z L. Cause analysis of longitudinal cracking of extrusion cylinder lining[J]. Physics Examination and Testing,2023,41(1):25-30.


 


[6]宋宗焘.大型挤压筒复杂服役条件下蠕变疲劳损伤机理与寿命预测[D]. 重庆:重庆大学,2015.


 


Song Z T. Creepfatigue Damage Mechanism and Lifetime Prediction of Large Extrusion Container under Complicated Service Conditions[D]. Chongqing: Chongqing University,2015.


 


[7]李进,董海防,马良涛,等.双层厚壁圆筒过盈装配时的应力解析解[J]. 机械设计与制造, 2020(3): 229-232.


 


Li J, Dong H F, Ma L T, et al. Stress analytic solution of double thick wall cylinder during interference assembly [J]. Machinery Design & Manufacture, 2020(3): 229-232.


 


[8]李永亮,高素荷.挤压机挤压筒过盈配合接触问题的有限元分析[J].科技创新与生产力,2015(7):68-70.


 


Li Y L, Gao S H. The finite element machine extrusion cylinder with interference analysis of contact problems of extrusion [J]. Scitech Innovation and Productivity, 2015(7):68-70.


 


[9]黄胜,田怀前,柴星,.重型挤压机三层挤压筒装配应力计算及应用[J].中国重型装备,2023(3):6-9.


 


Huang S, Tian H Q, Chai X, et al. Assembly stress calculation and application of trilayered extrusion container of heavyduty extruder [J]. China Heavy Equipment,2023 (3):6-9.


 


[10]叶涛.预应力钢丝缠绕超高压液压缸的结构设计[D]. 扬州:扬州大学,2017.


 


Ye T. Structural Design of Prestressed Steel Wire Wound Hydraulic Cylinder [D]. Yang Zhou: Yangzhou University, 2017.


 


[11]余其成. 钢丝缠绕扁挤压筒结构优化设计及其有限元分析[D]. 淮南:安徽理工大学,2022.


 


Yu Q C. Structural Optimization Design and Finite Element Analysis of Steel Wire Wound Flat Extrusion Cylinder [D]. Huai′nan: Anhui University of Science and Technology, 2022.


 


[12]董永刚,黄鑫磊,宋剑锋,.基于有限元仿真及局部应力应变法的组合式支承辊套内外表面疲劳寿命预测[J].塑性工程学报,2021,28(3):198-204.


 


Dong Y G. Huang X L, Song J F, et al. Fatigue life prediction of inner and outer surface of composite back-up roller sleeve based on finite element simulation and local stress strain method[J]. Journal of Plasticity Engineering,2021,28(3):198-204.


 


[13]于泓,周杰,黄界.超长大过盈组合厚壁圆筒装配方法研究及应用[J].中国重型装备,2022(4):85-89.


 


Yu H, Zhou J, Huang J. Study on and application of assembly methods of extra-long large-interference combined thick wall cylinder [J]. China Heavy Equipment, 2022 (4): 85-89.

Service:
This site has not yet opened Download Service】【Add Favorite
Copyright Forging & Stamping Technology.All rights reserved
 Sponsored by: Beijing Research Institute of Mechanical and Electrical Technology; Society for Technology of Plasticity, CMES
Tel: +86-010-62920652 +86-010-82415085     Fax:+86-010-62920652
Address: No.18 Xueqing Road, Beijing 100083, P. R. China
 E-mail: fst@263.net    dyjsgg@163.com